PROJECTS

Home/PROJECTS
4 01, 2021

The connectors from SBI installed in HVDC converters of the IFA2 project

The connectors from SBI validated thanks to the use of corona simulations for their installation in HVDC converters of the IFA2 project Our high voltage connectors are also present in the IFA2 project. A 1000 MW HVDC (high voltage direct [...]

27 10, 2020

HV connectors for substations in Ireland

Offaly battery's substations in Ireland HV connectors and vibration dampers from SBI CONNECTORS in the substations of Offaly battery project in Ireland. Offaly battery is one of the first projects in Ireland of significant scale for battery energy storage. And [...]

25 11, 2019

HV connectors for substations in INDONESIA

Garuda Shakti Substation in Indonesia SBI delivers an important substation project in Indonesia providing HV connectors for substations. SBI CONNECTORS and our HV connectors for substations take part in this important substation project in Sumatra Island, Indonesia. "Electric Highway" which is [...]